Qingdao Evergreen Industry Co.,Ltd. locates in Qingdao, China.
We mainly manufacture and export a variety of casting products for architectural, automotive, mechanical parts.
Our main product line includes Investment casting,sand casting, Die-casting, forging and Stamping ,CNC .
Materials vary from grey iron, ductile iron, bronze, aluminum, Alloy steel, stainless steel, and so on.
We have a strong and highly efficient R&D team which can design and make OEM/ODM products according to your ideas and samples.
All of our operations are strictly compliant with ISO 9001: 2008 guidelines We own automated casting lines, CNC machining, CMM inspection, spectrometers and MT testing equipment, X-ray.
| Item name |
Metal Stamping Parts |
| Materials available |
stamping, welding, and CNC machining , die casting, permanent mold casting, forging |
| Design |
We use the most advanced mould design software Auto CAD, Pro/E, Solidworks, UG (dwg, dxf, IGS, STP, X-T) |
| Production Shape |
Various shapes are available |
| Processing Type |
Multistep Progressive Dies |
| Tolerance |
as per customers' requirement. |
| Material |
Iron, Aluminum, Carbon Steel, Brass, Stainless steel etc. |
| Surface Treatment |
Anodize, Chromate, Electrolytic Plating, Nickel Plating, Galvanize, Tempered, Paint, Powder Coating, Polish etc. |
| Type |
Cold stamping |
| Industry Of Use |
Machinery manufacturing, electronics, aviation, industrial equipment, electrical, architectural decoration, lighting, auto parts, transportation, medical, computer products, agricultural food and so on. |
| Sample Lead-time |
Within 1day for samples available from our stock |
| Mass Production Lead-time |
3-7 weeks after receiving deposit |
| Payment Terms |
EXW/FOB/CFR/CIF Qingdao or any other airport or seaport, China |
| Payment |
30% deposit, balance against B/L copy |
| Delivery Time |
25-60 days based on the different products |
| Package |
Carton,Wooden Case or as Required |
FAQ
1.How can I get the quotation?
Please give us your drawing,quantity,weight and material of the product.
2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your main order time?
Sample time: 30-25 days after start to make mold. Order time: 35-30 days, the accurate time depends on product.
4.What is your payment method?
Tooling:100% T/T advanced Order time:50% deposit,50%to be paid before shipment.
5.Which kind of file format you can read?
PDF, IGS, DWG, STEP, MAX
6.What is your surface treatment?
Including: powder coating, sand blasting, painting, polishing, acid pickling, anodizing, enamel, zinc plating, hot-dip galvanizing, electrophoresis, chrome plating.
7.What is your way of packing?
Normally we pack goods according to customers' requirements.